Home / Search / Barfi

Barfi

The BMC aims to complete Mumbai’s 1.75-km JVPD flyover by December 31, 2027, ahead of the scheduled March 2028 deadline. The project is expected to bypass five major traffic junctions and reduce peak-hour travel time from 45 minutes to around 20 minutes

Updated 2 days ago

The 1.75-km-long flyover, which will be 15.10 metres wide, is being constructed from the end of the CD Barfiwala flyover in Andheri West to the Juhu-Versova Link Road. PIC/BY SPECIAL ARRANGEMENT

Mihir Ahuja is set to star in Aditya Chandioke’s untitled dramedy, playing a character from Ujjain. Calling the film special, he revealed he is studying the Ujjaini and Malwai dialects, culture and mannerisms to portray the role with honesty

Updated 4 months ago

The 1.75-km-long flyover, which will be 15.10 metres wide, is being constructed from the end of the CD Barfiwala flyover in Andheri West to the Juhu-Versova Link Road. PIC/BY SPECIAL ARRANGEMENT