Home / Mumbai / Mumbai News / Article / Mumbai: BMC tightens oversight of pre-monsoon desilting, sets May 31 deadline

Mumbai: BMC tightens oversight of pre-monsoon desilting, sets May 31 deadline

The civic body has emphasised that planning should be carried out on a drain-wise and day-wise basis, with daily updates recorded in a centralised digital system

Listen to this article :
Pic/BMC

Pic/BMC

The Brihanmumbai Municipal Corporation (BMC) has intensified its pre-monsoon desilting operations across the city, mandating stricter on-site supervision, structured planning, and daily progress tracking to improve efficiency and transparency.

Engineers Directed to Stay On-Site

According to the BMC, Additional Municipal Commissioner (Projects) Abhijit Bangar has instructed that Deputy Engineers and Assistant Engineers must remain physically present at desilting sites throughout the duration of the work. The civic body has emphasised that planning should be carried out on a drain-wise and day-wise basis, with daily updates recorded in a centralised digital system.

How do you like the new new mid-day.com experience? Share your feedback and help us improve.

Read Next Story
Central Railway to launch 14 new Mumbai AC local trains on Harbour Line from May 1; check details here

Trending Stories

Latest Photoscta-pos

Latest VideosView All

Latest Web StoriesView All

Mid-Day FastView All

Advertisement