Home / News / India News / Photos / IN PHOTOS: Potholes plague Samruddhi Mahamarg just weeks after grand inauguration

IN PHOTOS: Potholes plague Samruddhi Mahamarg just weeks after grand inauguration

Updated On: 24 June, 2025 10:41 AM IST | Anushree Gaikwad

Potholes have emerged on the newly inaugurated 76-kilometre stretch of the Samruddhi Mahamarg between Igatpuri (Nashik) and Amane (near Mumbai), posing a serious threat to motorists cruising at high speeds. (Pics/ Special Arrangements)

01
The stretch was inaugurated to much fanfare by Maharashtra Chief Minister Devendra Fadnavis, and Deputy Chief Ministers Ajit Pawar and Eknath Shinde on June 5. Pic/ Special Arrangement
The stretch was inaugurated to much fanfare by Maharashtra Chief Minister Devendra Fadnavis, and Deputy Chief Ministers Ajit Pawar and Eknath Shinde on June 5. Pic/ Special Arrangement
02
A Mumbai-based motorist who travelled on this stretch on Sunday shared photographs with mid-day, showing multiple potholes on the asphalt section of a bridge near the Shahapur exit

A Mumbai-based motorist who travelled on this stretch on Sunday shared photographs with mid-day, showing multiple potholes on the asphalt section of a bridge near the Shahapur exit

03
While most of the Samruddhi Mahamarg is constructed using cement concrete (CC), bridge portions are paved with asphalt. The pictures shared by the motorist reveal 5–6 visible potholes on the bridge surface of the expressway

While most of the Samruddhi Mahamarg is constructed using cement concrete (CC), bridge portions are paved with asphalt. The pictures shared by the motorist reveal 5–6 visible potholes on the bridge surface of the expressway

04
The 76-km Igatpuri–Amane stretch, built at a cost of Rs 1182 crore, has been open for barely two weeks, making the premature appearance of potholes all the more concerning

The 76-km Igatpuri–Amane stretch, built at a cost of Rs 1182 crore, has been open for barely two weeks, making the premature appearance of potholes all the more concerning

05
This isn’t the first time the Samruddhi Mahamarg’s quality has come under scrutiny. In April 2025, mid-day reported how cracks had developed on the concrete surface between Amane and Shahapur, even before it was open to traffic

This isn’t the first time the Samruddhi Mahamarg’s quality has come under scrutiny. In April 2025, mid-day reported how cracks had developed on the concrete surface between Amane and Shahapur, even before it was open to traffic

06
The report also revealed how motorists were illegally accessing unopened sections of the highway

The report also revealed how motorists were illegally accessing unopened sections of the highway

07
The Maharashtra State Road Development Corporation (MSRDC) officials were unavailable for comment by press time

The Maharashtra State Road Development Corporation (MSRDC) officials were unavailable for comment by press time

Recommended Photos

Next Gallery

Photo of Day

Charging up

Charging up

A Great Eggfly butterfly rests on a battery swapping station slot at Bandongri, Kandivli East. PIC/Satej Shinde