Home / Mumbai / Mumbai News / Article /
Thane-Borivali twin tunnel project gains pace as first TBM ‘Nayak’ set for launch
Updated On: 04 April, 2026 07:50 AM IST | Mumbai | Rajendra B. Aklekar
The first tunnel boring machine, Nayak, is locked and loaded under city, with drilling to begin on Monday on the 11.8-km Thane-Borivli twin tunnel that promises to slash travel time and break one of Mumbai’s worst choke points. Rajendra B Aklekar and Ranjeet Jadhav report

Tunnel boring machine ‘Nayak’ at the project site in Manpada, Thane. Pics/Ashish Raje
The Thane-Borivli twin tunnel project is set to gain momentum with the launch of its first Tunnel Boring Machine (TBM) ‘Nayak’ on Monday. The 11.84-km underground corridor is being implemented by Mumbai Metropolitan Region Development Authority (MMRDA)and executed by Megha Engineering & Infrastructures Ltd. mid-day got an exclusive look at the preparations on site.
Team behind TBMs ‘Arjuna’ and ‘Nayak’, which are being launched in phases at Manpada, Thane, on Friday
How do you like the new new mid-day.com experience? Share your feedback and help us improve.

