Home / Mumbai / Mumbai News / Article /
Central Railway to operate block at Kasara from Oct 14 to 16; several suburban and Express services to be affected
Updated On: 12 October, 2026 07:00 PM IST | Mumbai | mid-day online correspondent
The blocks are part of a 12-day programme being carried out from October 7 to 18 for pre-non-interlocking, non-interlocking and post-non-interlocking work, along with the extension of the Up Yard line towards Igatpuri

Suburban services between Asangaon and Kasara will not be available during the block periods. Representational Pic/File/Satej Shinde
Mumbai’s suburban and long-distance train services will be affected from October 14 to 16 as Central Railway on Monday announced that it will undertake special traffic and power blocks at Kasara for work related to the Asangaon-Kasara third-line project, an official statement said.
The blocks are part of a 12-day programme being carried out from October 7 to 18 for pre-non-interlocking, non-interlocking and post-non-interlocking work, along with the extension of the Up Yard line towards Igatpuri.


