Home / Mumbai / Mumbai News / Article /
CR’s Mumbai Division to operate special traffic and power blocks at Lonavala–BVT Yard till December 10
Updated On: 05 December, 2025 07:17 PM IST | Mumbai | mid-day online correspondent
The works include extension of three R&D lines in the DOWN yard, five R&D lines in the UP yard, and provision of one additional line. As a result, the running of Mail and Express trains, as well as Pune–Lonavala suburban services, will be affected during this period

A block will be operated on all the lines of Lonavala-BVT yard from 2.15 am to 6.15 pm. Representational pic
Central Railway’s (CR) Mumbai Division will operate special traffic and power blocks for pre-non-interlocking (NI) and non-interlocking works at the Lonavala-BVT Yard as part of remodelling and extension of R&D lines on the Kalyan–Lonavala section. The pre-NI block will be in force on December 7 (Sunday), followed by post-NI blocks on December 8 (Monday) and December 10 (Wednesday).
The works include extension of three R&D lines in the DOWN yard, five R&D lines in the UP yard, and provision of one additional line. As a result, the running of Mail and Express trains, as well as Pune–Lonavala suburban services, will be affected during this period.
How do you like the new new mid-day.com experience? Share your feedback and help us improve.

